During Test Estimation, a Test Manager must evaluate four things:
- Cost
- Resources
- Human Skills
- Time
They can estimate the project in following ways:
- Work breakdown structure (WBS): Breaking down project into smaller segments
- Three-point estimation: Three-point estimation is based on statistical data
- Functional point method: Give weightage to each function and measure the size